US Marine Corps AGCC - 29 Palms, CA


AllCom performed full EFI&T of five Nortel Option 81C 1000M switches. This installation included complete database commissioning including subscriber database collection, conversions & input. AllCom also designed and installed five Emerson DC power plants, inverters, batteries and disconnects as well as an outboard alarm reporting system. In addition, AllCom provided full EFI&T of CSU’s, ISDN PRI integration, cable ladder infrastructure, MDF’s and MDF verification, cross-connects and fault protection subsystems. After performing a complex flash cut-over of more than 9,000 active lines to the new Nortel equipment, AllCom completely decommissioned and de-installed an ESS5 including multiple power plants and peripherals.

 


For several months during this project, AllCom dedicated a switch technician to work with Nortel Product Management to assist in the development and testing of custom software to solve issues with DSN number conflicts at the base.

 

 
  copyright allcom gs